Publication archive
Height inspection before welding
Insight into a published application or lecture from the CRETEC archive.
Archive content: Information refers to the original publication status. Please coordinate current execution, scope of services and availability with CRETEC.
Enlarge the image ↗
Enlarge the image ↗
Enlarge the image ↗
Enlarge the image ↗
Enlarge the image ↗
Enlarge the image ↗Height inspection before welding
Project type:
Automotive
Date
2021
The customer is a manufacturer of turbochargers.
In a XXXX robotic welding machine, the height of small metal parts must be checked before welding. See image below.
There is a positioning mechanism in the field of view, and the robot's operating range must be kept clear so that a working distance of about 1,000 mm is required. See image below.
The cycle time should be "as fast as possible". A test within 1 second is in order.
Request for this application →
Project request ↗